28/09/2026 - Officer Decision - Permitted Extension to Healthwatch Kingston Contract ref: 5631    Decision made

Decision Maker: Director of Public Health

Decision published: 05/11/2026

Effective from: 28/09/2026

Decision:

Permitted 6 month extension to the Healthwatch Kingston contract


04/11/2026 - Officer Decision - Power of Attorney for Cambridge Road (RBK) Ltd ref: 5630    Decision made

Decision Maker: Executive Director Place

Decision published: 05/11/2026

Effective from: 04/11/2026

Decision:

Entered into and signed the legal agreements required on behalf of the Royal Borough of Kingston upon Thames to grant a new Power of Attorney (POA) to named representatives of the Cambridge Road (RBK) LLP and Vistry West London for the execution of documents in accordance with terms of the Power of Attorney and Side Letter as described in the report to the Corporate and Resources Committee on 24 September 2026.


04/11/2026 - Chessington Area Study 9 ref: 5629    For Determination

Decision Maker: South of the Borough Neighbourhood Committee

Made at meeting: 04/11/2026 - South of the Borough Neighbourhood Committee

Decision published: 05/11/2026

Effective from: 04/11/2026

Decision:

RESOLVED that:

 

1.    A public realm improvement scheme outlined in Annex 2 on Church Lane, Chessington be implemented, subject to engagement with the local community.

 

2.    Authority be delegated to the Director of Highways, Transport and Regulatory Services (or equivalent officer), in consultation with the Chair of the Neighbourhood Committee, Vice Chair and Ward Members, to make minor amendments to the scheme design arising from engagement feedback, statutory consultation and detailed design, and to formally consider any representations received at statutory consultation

 


04/11/2026 - Community Grants Program ref: 5627    For Determination

Decision Maker: South of the Borough Neighbourhood Committee

Made at meeting: 04/11/2026 - South of the Borough Neighbourhood Committee

Decision published: 05/11/2026

Effective from: 04/11/2026

Decision:

RESOLVED that:

 

1. the application for a £3,000 Neighbourhood Community Grant from

Ariadne’s Thread CiC, as set out in paragraphs 5-9 of the report, be

approved;

 

2. the application for a £3,000 Neighbourhood Community Grant from

The Community Brain, as set out in paragraphs 10-14 of the report, be

approved;

 

3. the application for a £3,000 Neighbourhood Community Grant from

MAN&BOY, as set out in paragraphs 15-19 of the report, be

approved.

 


04/11/2026 - Prioritised Intervention - Speed Reduction in the Neighbourhood - Phase 2 ref: 5628    For Determination

Decision Maker: South of the Borough Neighbourhood Committee

Made at meeting: 04/11/2026 - South of the Borough Neighbourhood Committee

Decision published: 05/11/2026

Effective from: 04/11/2026

Decision:

RESOLVED that:

 

1. the 20mph speed limit programme and speeds reported in paragraphs 1-10 and Annex 1 of the report be noted;

 

2. the installation of Speed Indicator Devices (SIDs), speed cushions, speed tables and banners on lamp columns in locations set out in Annex 1 of the report be approved subject to local engagement;

 

3. the proposed changes to previous proposals for Bridge Road and Moor Lane, from last year’s review, as set out in Key Point B of the report be noted;

 

4. any physical measures be done subject to local consultation and the item to be discussed with the chair, vice chair and ward Members in deciding on the way forward;

 

and

 

5. authority be delegated to the Director Highways, Transport and Regulatory Services, in consultation with the Committee Chair, Vice-Chair and relevant Ward Members, to determine and address any objections arising from the local engagement.

 


03/11/2026 - Tolworth Close - Experimental Traffic Management Order (ETMO) Consultation ref: 5626    Decision made

Decision Maker: Surbiton Neighbourhood Committee

Made at meeting: 03/11/2026 - Surbiton Neighbourhood Committee

Decision published: 04/11/2026

Effective from: 18/11/2026

Decision:

RESOLVED that:

 

(i)        the traffic survey data in Annex 2 and consultation responses in Annex 3 in the LATE MATERIAL regarding the Experimental Traffic Management Order (ETMO) for closing Tolworth Close be formally noted;

 

(ii)        the formal objections received be considered and set aside, and approval be granted to make the Tolworth Close modal filter permanent (Option A), as detailed in paragraphs 18-21 of the report in the LATE MATERIAL;

 

(iii)       consultation on the introduction of an additional single yellow line on Raeburn Avenue between house no. 52 and Ewell Road be conducted, as part of a wider consultation on speed cushions and a zebra crossing near Sainsbury’s, and a further report on the consultation outcome be brought back to the Committee for consideration; and

 

(iv)      all statutory consultees and objectors be notified of the Committee’s decision.


03/11/2026 - Prioritised Intervention - Speed Reduction in the Neighbourhood - Phase 2 ref: 5625    Decision made

Decision Maker: Surbiton Neighbourhood Committee

Made at meeting: 03/11/2026 - Surbiton Neighbourhood Committee

Decision published: 04/11/2026

Effective from: 18/11/2026

Decision:

RESOLVED that:

 

(i)        the 20mph speed limit programme and speeds reported in paragraphs 1-10 and Annex 1 of the report be noted; and

 

(ii)        local consultation be conducted for options (including the installation of Speed Indicator Devices (SIDs), speed cushions, speed tables and banners on lamp columns) in the locations in which officers recommended mitigation measure(s) as set out in Annex 1 of the report, and a further report on the consultation outcome be brought back to the Committee for consideration of progressive implementation of measures, if required.


03/11/2026 - Community Grants Programme ref: 5624    Decision made

Decision Maker: Surbiton Neighbourhood Committee

Made at meeting: 03/11/2026 - Surbiton Neighbourhood Committee

Decision published: 04/11/2026

Effective from: 18/11/2026

Decision:

RESOLVED that:

 

(i)         the application for a £3,000 Neighbourhood Community Grant from Head2Head Sensory Theatre, as set out in paragraphs 5-10 of the report, be approved;

 

(ii)        the application for a £3,000 Neighbourhood Community Grant from The Community Brain, as set out in paragraphs 11-16 of the report, be approved;

 

(iii)       the application for a £2,000 Neighbourhood Community Grant from Kingston Carers Network, as set out in paragraphs 17-21 of the report, be approved;

 

(iv)       the application for a £3,000 Neighbourhood Community Grant from Achieving for Children, as set out in paragraphs 22-28 of the report, be approved; and

 

(v)        the application for a £3,000 Neighbourhood Community Grant from Man & Boy, as set out in paragraphs 29-34 of the report, be approved.


13/10/2026 - Petition - 'End plastic use in Kingston Cemetery' ref: 5618    Decision made

Decision Maker: Council

Made at meeting: 13/10/2026 - Council

Decision published: 03/11/2026

Effective from: 13/10/2026

Decision:

The Council debated a petition titled "End plastic use in Kingston Cemetery," which received 1,241 verified signatures.

 

In accordance with the Council’s Petition Scheme outlined in Part 4G of the Council’s Constitution the petition organiser addressed the meeting to present the petition. The Lead Petitioner requested that the Council begin a phased withdrawal of plastic decorative items on graves at Kingston Cemetery to protect the cemetery's biodiversity.

 

It was moved by Councillor Andreas Kirsch and seconded by Councillor Nicola Nardelli that the recommendation to note the petition and the officer comments be approved.

 

During the debate, Councillor James Giles moved, seconded by Councillor Yvonne Tracey, that Procedure Rules be suspended to permit the Council to debate taking the actions requested by the petition. Upon being put to the vote, the procedural motion was lost.

 

Voting:

 

For: Councillors Giles, Tracey (2)

 

Against: Councillors Ansari, Austen, Bailey, Barker, Beynon, Davey, Dunstone, Durrant, Evans, Foulder-Hughes, Grocott, Heap, Holt, Dongsung Kim, Kirsch (Andreas), Kirsch (Griseldis), Malik, Manders, Manners, Massimi, Milestone, Mirza, Murphet, Nardelli, Park, Reeve, Sadler, Schaper, Shukla, Tulyani, Wait-Sillett, Wimalathasan, Yoganathan (33)

 

Abstain: Councillors George, Lim, Thayalan (3)

 

Following further debate, a vote was taken and it was RESOLVED to note the petition and the officer comments outlined in the report.

 

Voting:

 

For: Councillors Ansari, Austen, Bailey, Barker, Beynon, Davey, Dunstone, Durrant, Evans, Foulder-Hughes, Grocott, Heap, Holt, Dongsung Kim, Kirsch (Andreas), Kirsch (Griseldis), Malik, Manders, Manners, Massimi, Milestone, Mirza, Murphet, Nardelli, Park, Reeve, Sadler, Schaper, Shukla, Tulyani, Wait-Sillett, Wimalathasan, Yoganathan (33)

 

Against: Councillors George, Tracey (2)

 

Abstain: Councillors Giles, Lim, Thayalan (3)


13/10/2026 - Review of the Constitution - Changes Required due to the Planning and Infrastructure Act 2025 ref: 5619    Recommendations Approved

Decision Maker: Council

Made at meeting: 13/10/2026 - Council

Decision published: 03/11/2026

Effective from: 13/10/2026

Decision:

Members considered recommendations from the Corporate and Resources Committee held on 24 September 2026 to make necessary changes to the Council's constitution resulting from the Town and Country Planning (Discharge of Local Planning Authority Functions) (England) Regulations 2026. Members noted that the Council needed to make amendments to its constitution to ensure that it complied with the requirements of the regulations.

 

The regulations, which would come into effect on 31 October 2026, introduced a new national scheme of delegation for planning decisions and set out which applications would be determined by officers and, subject to the satisfactory completion of a gateway test, which applications would be determined by the Planning Committee.

 

Councillor Andreas Kirsch moved the recommendations, seconded by Councillor Mark Beynon, and it was RESOLVED that Parts 3A ‘Responsibility for Functions’ and 5D ‘Planning Protocol & Planning Committee Procedure Rules’ be amended as set out in Appendices B and C of the agenda report.

 

Voting:

 

For: Councillors Ansari, Austen, Bailey, Barker, Beynon, Davey, Dunstone, Durrant, Evans, Foulder-Hughes, George, Grocott, Heap, Holt, Dongsung Kim, Kirsch (Andreas), Kirsch (Griseldis), Malik, Manders, Manners, Massimi, Milestone, Mirza, Murphet, Nardelli, Park, Reeve, Sadler, Schaper, Shukla, Tulyani, Wait-Sillett, Wimalathasan, Yoganathan (34)

 

Against: None

 

Abstain: Councillors Giles, Lim, Thayalan, Tracey


27/10/2026 - 26/01453/FUL - 223 South Lane, New Malden, KT3 5EW ref: 5621    Recommendations Approved

Decision Maker: New and Old Malden Neighbourhood Committee

Made at meeting: 27/10/2026 - New and Old Malden Neighbourhood Committee

Decision published: 30/10/2026

Effective from: 27/10/2026

Decision:

Members considered a planning application for the change of use from a 6-person HMO (Use Class C4) to an 8-person HMO (Use Class Sui Generis) Demolition of the existing riding school buildings and the erection of 2x Blocks to accommodate 52 No. residential apartments, with associated car parking and landscaping.

 

Public Speakers:

 

For

 

Against

Pejman Bardiani

Jean Summers

 

Councillor James Giles addressed the Committee as Councillors who had called the application in for Committee consideration. Councillor Giles declared that as he had publicly expressed opinions on the application he would not participate in the debate or voting of the item.

 

RESOLVED to approve the application and delegate authority to the Director of Planning and Regeneration, in consultation with the Chair of the New and Old Malden Neighbourhood Committee, to finalise the following conditions, including any amendments, additions or deletions reasonably necessary to give effect to the Committee’s resolution, and before issuing the decision, satisfy section 100ZA in relation to conditions 3, 4 and 6, including obtaining the applicant’s written agreement to their terms unless a prescribed exception applies. These conditions apply before a material change of use and should not be treated as outside that procedure merely because they are described as pre-use conditions, and subject to the following conditions and informatives:

 

Conditions:

 

1. Approved drawings

 

Except as expressly required by conditions 3, 4, 5 and 6, the development hereby permitted shall be carried out in accordance with the drawings listed below. The use and accommodation shall thereafter be retained in accordance with those drawings and conditions.

Technical fire-alarm grades and system specifications annotated on the drawings are not incorporated as requirements of this planning permission. The planning requirements for the escape arrangements are set out in condition 6.

 

PP-14852915v1 Location Plan dated 2 July 2026

TQRQM26183144218192 Block Plan dated 2 July 2026

1821/9 Proposed Site Plan, April 2026

1821/1 Existing and Proposed Ground Floor Plan, April 2026

1821/4 Proposed First Floor Plan, June 2026

1821/5 Proposed Second Floor Plan, June 2026

1821/6 Existing and Proposed Front Elevation, June 2026

1821/7 Existing and Proposed Side Elevation, June 2026

1821/8 Existing and Proposed Rear Elevation, June 2026

 

Reason: For certainty as to the development permitted and to secure the layout on which the assessment is based.

 

2. Time limit

 

The development hereby permitted shall begin before the expiration of three years from the date of this permission.

 

Reason: To comply with section 91 of the Town and Country Planning Act 1990, as amended.

 

3. Cycle parking

 

The change of use hereby permitted shall not begin until details of secure, covered and lockable parking for at least eight cycles have been submitted to and approved in writing by the Local Planning Authority and the approved facilities have been installed.

 

The details shall show the location, dimensions, stands, enclosure and access arrangements, and shall be designed in accordance with the London Cycling Design Standards. Notwithstanding the indicative cycle-storage annotations on drawing 1821/9, the facilities and their access shall be accommodated within existing structures or existing hard-surfaced areas. Their installation shall not require vegetation clearance, loss of vegetated ground, removal of trees or hedges, or excavation damaging the roots of retained trees or hedges. The layout shall avoid obstruction of vehicle access, pedestrian circulation and the escape routes and final exits shown on the approved floor plans.

 

The approved facilities shall thereafter be retained, kept available for residents’ cycle parking and kept free from obstruction for the duration of the permitted HMO use.

 

Reason: To secure convenient and safe cycle parking before the increased occupancy begins, promote sustainable travel and protect existing habitat, in accordance with London Plan Policies T5 and G6 and Core Strategy Policies CS6, DM8 and DM6.

 

4. Refuse and recycling

 

The change of use hereby permitted shall not begin until details of refuse and recycling storage sufficient to serve eight residents have been submitted to and approved in writing by the Local Planning Authority and the approved facilities have been installed.

 

The details shall specify the number and capacity of containers, enclosure design, storage position on the existing hard-surfaced forecourt and access for residents and collection. Installation shall not require vegetation clearance, loss of vegetated ground, removal of trees or hedges, or excavation damaging the roots of retained trees or hedges. The facilities shall not obstruct vehicle access, pedestrian circulation, escape routes or final exits.

 

The approved storage facilities shall thereafter be retained and kept available for their intended purpose for the duration of the permitted HMO use. Containers shall be kept within the approved storage area except when presented for collection in accordance with the waste collection service’s arrangements, and shall be returned to that area following collection.

 

Reason: To ensure adequate waste storage is available before the increased occupancy begins and to protect residential amenity, the appearance of the area and existing habitat, in accordance with London Plan Policies SI 7 and G6 and Core Strategy Policies CS9, DM10 and DM6.

 

5. Occupancy and communal facilities

 

The HMO hereby permitted shall accommodate no more than eight residents in total. The eight bedrooms shown on drawings 1821/1, 1821/4 and 1821/5 shall each be occupied by no more than one resident.

 

The communal kitchen/living room shown on drawing 1821/1 and the landing-accessed shower rooms on drawings 1821/4 and 1821/5 shall be retained and made available to the residents for their respective communal purposes throughout the permitted HMO use. Notwithstanding the room-number labels on those drawings, both landing-accessed shower rooms shall remain communal and shall not be allocated exclusively to an individual bedroom. The communal kitchen/living room and the communal shower rooms shall not be used as bedrooms.

 

Reason: To restrict the intensity of occupation to that assessed and retain sufficient shared facilities, in the interests of existing and future residents, in accordance with London Plan Policies D3 and D6 and Core Strategy Policy DM10.

 

6. Escape arrangements

 

The change of use hereby permitted shall not begin until the protected stairway and circulation routes, fire-resisting doors and final exits shown on drawings 1821/1, 1821/4 and 1821/5 have been provided. Those arrangements shall thereafter be retained, and the escape routes and final exits kept unobstructed and available for their intended purpose, for the duration of the permitted HMO use.

 

Reason: To secure the escape layout before increased occupancy begins and retain the arrangements on which the planning assessment relies, in accordance with London Plan Policy D12.

 

Voting: Unanimous

Councillors James Giles and Yvonne Tracey did not participate in the debate or voting of the item.

 


27/10/2026 - 25/03198/FUL - 26 Westbury Road, KT3 5BE ref: 5620    Decision made

Decision Maker: New and Old Malden Neighbourhood Committee

Made at meeting: 27/10/2026 - New and Old Malden Neighbourhood Committee

Decision published: 30/10/2026

Effective from: 27/10/2026

Decision:

Members considered an application for the erection of a single storey rear extension.

 

Public Speakers:

 

For

 

Against

Ray Kerplan – representative of SAM Planning

Charlie Reid

 

Councillors Yvonne Tracey and James Giles addressed the Committee as Councillors who had called the application in for Committee consideration. Both Councillors Tracey and Giles declared that as they had expressed opinions on the application they would not participate in the debate or voting of the item.

 

RESOLVED to refuse the application for the reasons set out below:

 

Reason 1:

The proposed rear extension, by enlarging the communal kitchen accommodation, introducing a flat roof, would facilitate a more intensive use of the premises. Having regard to the evidence of recurring anti-social behaviour and disturbance associated with the existing use, that intensification would be likely to exacerbate neighbouring residents’ reasonably founded fear of crime and cause unacceptable harm to their living conditions and enjoyment of their homes. The proposal would therefore be contrary to Policy DM10 of the Royal Borough of Kingston upon Thames Core Strategy 2012 and Policy D3 of the London Plan 2021.

 

Reason 2:

The applicant has failed to demonstrate that the proposed rear extension would preserve acceptable sunlight to the closest ground-floor habitable-room windows at No. 24 Westbury Road. The submitted assessment contains unresolved inconsistencies concerning site orientation, and it has not been satisfactorily established that the sunlight modelling uses the correct orientation. Having regard to the extension’s height, depth and proximity to those windows, the information provided is insufficient to demonstrate that the development would avoid an unacceptable loss of sunlight and consequent harm to neighbouring living conditions. The proposal is therefore contrary to Policy DM10 of the Royal Borough of Kingston upon Thames Core Strategy 2012 and Policy D3 of the London Plan 2021.

 

Reason 3:

The submitted drawings provide inconsistent information about the ground-floor accommodation, with a room identified as a bedroom on section drawing PR-S001 Rev A shown as a dining/living room on floor plan PR-P001 Rev A. This unresolved discrepancy creates uncertainty about the accuracy of the submitted description of the accommodation, including the provision of bedrooms and communal living space.

Consequently, the application does not provide a sufficiently reliable basis for assessing how the proposed extension would serve the property and whether it would facilitate increased activity causing unacceptable noise and disturbance to neighbouring occupiers. The applicant has therefore failed to demonstrate that the proposal would safeguard neighbouring residential amenity, as required by Policy DM10 of the Royal Borough of Kingston upon Thames Core Strategy 2012 and Policy D3 of the London Plan 2021.

 

Voting: Unanimous

 

Councillors James Giles and Yvonne Tracey did not participate in the debate or voting of the item.